Skip to content
Thursday, October 29, 2026 · Today’s edition, 6:30 a.m. ETThu, Oct 29 · 6:30 a.m. editionSign inMy Desk 0EditionsSign in

FERC proposes dropping air dispersion modeling from gas project reviews

The draft policy statement passed 4-1, with Commissioner Judy Chang saying it would weaken assessment of local air impacts.

At a glance

  1. The draft policy statement, adopted on a 4-1 vote at the agency's monthly meeting, is part of a package aimed at easing development of gas pipelines and LNG export terminals.
  2. Chairman Laura Swett said the proposals are geared in part to ensuring gas-fired power plants can get fuel.
  3. Air dispersion models simulate how a proposed project's emissions spread in the atmosphere and interact with background pollution and emissions from nearby sources, according to FERC.

The Federal Energy Regulatory Commission proposed Thursday to stop requiring air dispersion modeling in its reviews of gas projects under the National Environmental Policy Act. The draft policy statement, adopted on a 4-1 vote at the agency's monthly meeting, is part of a package aimed at easing development of gas pipelines and LNG export terminals.

Chairman Laura Swett said the proposals are geared in part to ensuring gas-fired power plants can get fuel. “Building generation involves gas,” she said. “The only current restriction on getting American gas is our ability to get the gas to market and the infrastructure bottlenecks.”

Air dispersion models simulate how a proposed project's emissions spread in the atmosphere and interact with background pollution and emissions from nearby sources, according to FERC. Swett called the models “an unnecessary source of confusion, delay and litigation risk.”

The draft policy statement says the streamlined approach is designed to bring NEPA analysis “back in line with the statutory text and common sense” and to avoid duplicating Clean Air Act review entrusted to the Environmental Protection Agency and state air permitting agencies. Swett said the change would address the bottleneck without reducing environmental oversight.

Commissioner Judy Chang dissented, saying the change would make it harder to assess how people near gas projects may be affected. Air dispersion models are “the best tool we have for understanding the likely local and regional air impacts of the projects we permit, outside of actually having physical monitors,” she said.

FERC also proposed a three-tiered blanket authorization framework for LNG projects. Some activities would proceed automatically without an application, others would require a 60-day notice and comment period, and additions at an existing plant—liquefaction trains, LNG tanks and marine berths—would require 90 days. FERC said the framework is “rooted in the simple principle” that the commission should devote its resources to projects that warrant searching scrutiny and give the rest a more efficient pathway. The 90-day review for adding liquefaction trains, LNG tanks or marine berths would give developers a clearer timetable, though gas projects would still go through NEPA analysis without the modeling step.

This publication has argued that grid interconnection and gas supply, not capital, now set the schedule for new load. Swett's framing is the same claim from the commission's side of the table, and the 4-1 vote leaves one commissioner on record that the change weakens FERC's ability to judge the local air effects of the projects it permits.

Reported by the Energy Transition desk from Utility Dive. Published . Corrections

Related

Infrastructure

FERC's cheapest route to PJM capacity runs through governance

A Harvard Law argument says the commission can reshape who decides PJM's planning protocol, and the amendment path is where transmission capital gets priced.

Infrastructure

Transmission bill BAAJA faces Senate cloture vote on Nov. 9

BAAJA would end incumbents' federal right of first refusal on regional lines and let FERC cut returns when upgrades slip.

Infrastructure

SpaceXAI faces $6.1 million Mississippi stormwater permit claim

MDEQ alleges work began at three sites before stormwater coverage; SpaceXAI disclosed the notice in an SEC filing and is negotiating an agreed order.

Infrastructure

FirstEnergy data center pipeline grows 4.8% to 26 GW

Two West Virginia utilities reserved turbines for a $2.7 billion gas-and-solar project and opened a 3 GW solicitation.

Infrastructure

GE Vernova to buy Trench Group for $9 billion

The deal includes about $5 billion in backlog and framework agreements and is expected to close in late 2027.

Private Infrastructure Dailyfrom Private Wealth Daily

Energy transition, digital infrastructure and core-plus funds. Daily at 7:25 a.m. ET.

Free. Every morning. Unsubscribe from any edition in one click.

From other sections