Skip to content
Wednesday, October 28, 2026 · Today’s edition, 6:30 a.m. ETWed, Oct 28 · 6:30 a.m. editionSign inMy Desk 0EditionsSign in

Pure Data Centres completes final Brent Cross transformer ahead of energization

The third 75MVA Hitachi Energy unit brings the LON01 substation to 150MVA; the second building is slated for completion in Q2 2029.

At a glance

  1. Energization of the 90MW campus is expected later this month, according to Data Center Dynamics.
  2. Hitachi Energy supplied the 75MVA transformers, which Pure says will support power supply to the campus's B1 and B2 buildings, with ductwork already in place for the B2 connection.
  3. PID reported in September that the Brent Cross shell was announced without a named tenant.

Pure Data Centres has completed installation of the third and final transformer at its LON01 campus in Brent Cross, London, bringing the substation's total capacity to 150MVA. Energization of the 90MW campus is expected later this month, according to Data Center Dynamics.

Hitachi Energy supplied the 75MVA transformers, which Pure says will support power supply to the campus's B1 and B2 buildings, with ductwork already in place for the B2 connection. Because restricted space around the live substation ruled out a conventional 500-ton crane, the project team built a specialist gantry system with 1,000 tons of lifting capacity to move the unit into position.

PID reported in September that the Brent Cross shell was announced without a named tenant.

Work on the second building began last month, with completion slated for Q2 2029. LON01 will use closed-loop liquid cooling for high-density AI inference and cloud workloads, and B2 is to carry a living wall that Pure describes as one of the world's largest, with more than 750,000 plants.

Reported by the Data centers & fiber desk from Data Center Dynamics. Published . Corrections

Related

Infrastructure

Pure starts piling on 70MW Brent Cross shell with no tenant named

The 70MW Brent Cross shell has a contractor, a cooling system, and a living wall, but no customer. Its returns wait on a lease the announcement does not name.

Infrastructure

UK budget ties critical data center grid access to community pledges

Critical data centers that commit to local jobs, water protection and community investment get priority connections and on-site generation permission, the chancellor said.

Infrastructure

RiverStreet files Chapter 11 to sell broadband network to Oaktree

The rural operator has about 30,000 customers and $20 million in CoBank financing for the case.

Infrastructure

Tata Communications plans $450 million India fiber build

The first of three phases runs the Mumbai-Pune-Hyderabad-Chennai corridor, a route Tata describes as key to Indian AI and hyperscale growth.

Infrastructure

Vertiv Q3 sales rise 61% and orders double

The power and cooling supplier lifted its 2026 sales guidance to $14.45 billion to $14.85 billion.

Private Infrastructure Dailyfrom Private Wealth Daily

Energy transition, digital infrastructure and core-plus funds. Daily at 7:25 a.m. ET.

Free. Every morning. Unsubscribe from any edition in one click.

From other sections