Skip to content
Thursday, October 29, 2026 · Today’s edition, 6:30 a.m. ETThu, Oct 29 · 6:30 a.m. editionSign inMy Desk 0EditionsSign in

US Signal acquires Hillsboro data center with 4.5MW on site

The 63,000-square-foot building, rebranded ORO2, is the Igneo-backed operator's first owned facility in the Portland metro area.

At a glance

  1. The building has 4.5MW of power on site and about 14,000 square feet of data hall space, with room to expand.
  2. For allocators underwriting Igneo, US Signal's owner, the expansion option changes the capacity math because Oregon has paused data center permits until July 2027, as Private Infrastructure Daily previously reported.
  3. US Signal already operates an Oregon facility in Bend, about 175 miles southeast of Hillsboro.

US Signal acquired a 63,000-square-foot data center in Hillsboro, Oregon.

It is the first facility the company owns in the Portland metro area and one of about 17 data centers it runs across seven states.

The building has 4.5MW of power on site and about 14,000 square feet of data hall space, with room to expand. It has been rebranded ORO2. Terms were not disclosed. Data Center Dynamics first reported the acquisition.

For allocators underwriting Igneo, US Signal's owner, the expansion option changes the capacity math because Oregon has paused data center permits until July 2027, as Private Infrastructure Daily previously reported. 'Hillsboro gives us a way to grow in a market where available capacity is extremely limited,' John White, chief operating officer, said in a statement.

US Signal already operates an Oregon facility in Bend, about 175 miles southeast of Hillsboro. It runs a 9,500-mile fiber network, and Igneo acquired it in February 2023.

Michael Ryder, partner and co-head of North America at Igneo, said the investment 'extends that model into the Portland metro area through an existing facility with room to grow.' The company's previous data center purchase, outside Chicago, was made in February.

Reported by the Data centers & fiber desk from Data Center Dynamics. Published . Corrections

Related

Infrastructure

EdgeCore, US Signal push data center ABS past $1 billion

EdgeCore's $521 million green ABS closed on a Santa Clara campus, more than double its previous Phoenix issue.

Infrastructure

KBRA assigns preliminary A- to up to $525 million US Signal ABS

Ten existing colocation sites with $111.8 million of annualized recurring revenue back the three-tranche deal, which carries a 12% stressed terminal cap rate.

Infrastructure

NERC stakeholders back draft reliability rules for 50MW-plus compute loads

The draft covers AI data centers and crypto miners at 50 MW or more and 100 kV or above, and it now moves to the NERC board and then FERC.

Infrastructure

Marwynn signs Grenada MoU for $500m solar and AI data center

The 24-month agreement gives Marwynn exclusivity to study land, grid and connectivity before committing capital.

Infrastructure

Chatterjee Group launches Cortex DC with 2 GW India target

The platform targets operational readiness within 18 months of breaking ground and plans to source 51% of its energy from green sources.

Private Infrastructure Dailyfrom Private Wealth Daily

Energy transition, digital infrastructure and core-plus funds. Daily at 7:25 a.m. ET.

Free. Every morning. Unsubscribe from any edition in one click.

From other sections